The Line · route & system
Fourteen stations, drawn to chainage.
All-stop and access-led, from Manchester Castlefield to Leeds Central. The alignment follows the Rochdale Canal, the Summit pass, the Calder & Hebble and the Aire & Calder.
01 — The route
The route, to scale.
Station positions are drawn to chainage — distance along the corridor from Manchester Castlefield. Apricot marks the two national-rail interchanges.
02 — Station by station
All fourteen, in order.
Model times are route-model references, not a service promise. Draft source labels included "After Mytholmroyd", "Copley-ish" and "West of Elland". The Leeds HS2 interchange appears in old source and should be checked before publication.
03 — The system
Very fast regional metro, not classic express rail.
Access-led and frequency-first. Every train stops at every station, and the corridor still averages 56 mph.
04 — The method
Drain. Excavate. Box. Cap.
Bank-to-bank cut-and-cover along the former canal corridor. Two running directions stacked vertically in one box, roughly 14 m deep, with the Green Spine on the lid.
Concept figures are source assumptions, not externally validated engineering claims.